Renovation project - new bedroom and kitchen (well sort of!) - Sunday 9th September
The break is over and it’s time to get to work, I start on
the attic bedrooms, it takes almost all day but we now have a bedroom that is
clean and dust free. The big walk in cupboard is given a coat of paint and the
last of the old pipe work removed. This is to become our water boiler cupboard
and a large walk in wardrobe (I can finally see some light at the end of the
tunnel!).
I did say it was clean and dust free not perfect!
All of our belongings are moved into here and we even have
some shelves! At least our clothes won’t be dusty before we even wear them
anymore, I also get 2 dresses out so that next time we go out for dinner I can
wear something different, I have had one going out outfit for the last 6 weeks,
I think the whole town has seen it and its time to prove I do possess some
other clothes!
John has been locked away in the kitchen and the hallway,
the joists are almost finished which means that we have nearly fully
functioning ceilings and floors.
He has spent the rest of the day getting the kitchen into
some sort of order; he fitted a temporary wooden worktop and rearranged the
white goods. The kitchen is starting to become quite functional!
There is still
some old lino on the floor and we take that up, the kitchen floor is covered in
original tiles and luckily they’re all in good condition other than being
covered in tile glue. So 2 hours is spent scraping, scrubbing with wire wool
then wiping down, it’s going to take a long time but they do look amazing!
We are still trying to decide what sort of kitchen to
install, it’s a toss up between a nice shiny white kitchen or a handmade wooden
one (happy to listen to people’s opinions on this one so please comment). But this is a decision
for later.
Had a Skype with my daughter and was so relieved to see her
looking well, you do worry far more about the kids when you are not there, this
is something that I think I will struggle with for a long time, but they are
coming to visit in less than 2 weeks !!!!!! They will be staying with friends,
as we don’t want to risk them staying in the house, my brother and his wife on
the other hand are coming to visit when the kids leave and will be staying
here!!!! So this means the en suite will have to be finished and completed and
2 bedrooms fully finished within the next 2 weeks, the race is on.
Top Tips
1.
When you find something original, it is worth
the effort to restore it, we have worked it out that it will take at least 2
full days on our hands and knees to bring the floor tiles back to their former
glory!
The race is on - we know just how you feel, my brother and his daughter arrive in less than two weeks but it seems we will be ready
ReplyDeleteDid you know that if a French kitchen explodes you get linoleum blownapart :)
David
ha ha ha, John had to explain it though, I thought your kitchen had blown up!
ReplyDelete