Friday, 8 January 2016

Renovation project - Time to leave our new house

Renovation project - Time to leave our new house

The water contractor cannot come out again for over a week, we really do not need to be here for the visit so we arrange to head back too Spain.

I try to pay the deposit before we leave but this has to be completed once the compromise has been signed, there is nothing we can do. The compromise will be sent to our property in Spain and we can sign there.

We call into the bank and arrange to make sure we can do larger value transfers than normally, everything is in place and we can head back to Spain.

This week is very exciting we have everything in place for our new property, in case you are interested this is what we are buying:


A 2 bed house with a one bed cottage and a garage and patio garden.

In the main house the water will not be connected, there is no heating, the electrics do not conform and require immediate work, there is woodworm and rot in the wood.

The little house is one room downstairs and one room upstairs (with no real stair case) it also will not have water, stairs or conforming electric etc!

But this property is not as a big a job as the last one and hopefully the little cottage will be rented out as a gite ready for this summer (2016)

So if you are thinking of holidaying in the area get in touch we would love to meet you

4 comments:

  1. Pretty house. Good luck with everything!

    ReplyDelete
    Replies
    1. Thanks Maggie, it is lovely can't wait to get started and bring it back to ts foormer glory :)

      Delete
  2. I love the look of the house xx so huelgoatian xxx

    ReplyDelete
    Replies
    1. Thank you it is a traditional house in the centre of town, just looking forward to getting started now :) xx

      Delete